After a site inspection of the building, it is undoubtedly difficult to lay out the lights on the two 120-meter-high buildings. It is undoubtedly difficult to consider the distribution of the power supply and the signal transmission of the controller, as well as the overall aesthetics and power supply effect. It's harder. The project uses D40 point light source series products and adopts the profile installation method. The power cord and signal line can be put into the profile groove to solve the problem of direct wiring of the lamps on the glass surface. The color of the shell is similar to that of the building body, reducing the difference between the lamp and the building body after installation, so that the product is hidden in the building, and the effect is obvious.