In this DROPS video we show how to increase and mark the increase stitches with different colours, the same way we do in the «Cheers to Lift» jumper in DROPS 212-28. INCREASE AS FOLLOWS IN THE STITCHES WITH PURPLE MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, move the purple marker to this stitch (i.e. stitch on right needle), but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and knit together the stitch and yarn over 1 more time = 3 stitches (= 2 stitches increased). The marker sits in the first increased stitch (= knitted stitch). The next time you increase, work in the stitch with the marker. INCREASE AS FOLLOWS IN THE STITCHES WITH GREEN MARKERS: Work 3 stitches in the stitch and yarn over and move the marker as follows: Knit together the yarn over and stitch, but do not slip the stitch and yarn-over off the left needle, make 1 yarn over the right needle and
Hide player controls
Hide resume playing