#242 After a short break to recharge the batteries, I will try to get this channel up and running again. This job was carried out at the beginning of August 2022. We will install a sewage tank, an infiltration bed, a control well, a rock pit and connect the main house and guest house to the system with new pipes. In this episode we connect the main house to the new system. We finish this job by laying out some topsoil, something to put the grass seeds in and it also bring all the different work areas together. Excavator: Cat 313FL with a Engcon EC219 integrated grab QS60GR20 Dump Truck: Bell On The Ground: Pontus, Irre & Hedblom Camera: GoPro Black 7 Video Editing: iMovie Location: Sweden Instagram: m_hedblom Mail: hedblomproduction@ FAQ: T.Ö Hansson is not my company, in my company it's just me. I am hired as a machine operator by T.Ö. Hansson and I'm paid per hour. That means that I own none of the machines you see in