Myvideo

Guest

Login

Keller Portugal Moita Stone Columns

Uploaded By: Myvideo
1 view
0
0 votes
0

Keller has just finished the geotechnical works on the new logistic platform of ALDI-Portugal located in Moita, 30 kms south of Lisboa. The works include aprox. 6700 stone columns with up to 16 m depth, in an area of c.a. m2, and have been performed with Vibrocat® rigs, these ones designed and built by Keller specifically to perform stone columns using electric depth vibrators, thus following the most suitable methodology for the performance of this soil treatment solution. Also 82 un. precast displacement piles were performed, using Juntann latest model rigs. Subscribe: Every day, people around the world live, work and play on ground prepared by Keller. Used alone or in combination, our techniques solve a wide range of geotechnical challenges across the entire construction sector – from industrial and commercial to housing, infrastructure and environmental projects. #KellerGroup #Geotechnical Website: Twitter:

Share with your friends

Link:

Embed:

Video Size:

Custom size:

x

Add to Playlist:

Favorites
My Playlist
Watch Later