Myvideo

Guest

Login

Voith rebuild of dryer section Jass Schwarza paper machine PM1 (EN)

Uploaded By: Myvideo
1 view
0
0 votes
0

In September 2015, Voith rebuilt the PM 1 at the Adolf Jass paper mill in Schwarza / Rudolstadt. The aim of the rebuild was to increase the maximum production speed for low grammages from 1,400 to 1,500 m/min and at the same time maintain the already excellent machine efficiency. Results of the rebuild: - Productivity increase with the same level of efficiency - ‘Clean design’ for improved runability - Web stabilization for higher machine speed

Share with your friends

Link:

Embed:

Video Size:

Custom size:

x

Add to Playlist:

Favorites
My Playlist
Watch Later