The CC 8800-1 Crane was repaired and raised, new nosecones were spotted inside the Starfactory, and Tower 2 module 7 was rolled out to the launch site. 🔗 NSF Store: ⚡ Become a member of NASASpaceflight's channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡ 🎥 Video from Mary (@BocaChicaGal) and Starbase Live. ✂️ Edited by Thomas (@_thomashayden). 🔍 If you are interested in using footage from this video, please review our content use policy: L2 Boca Chica (more clips and photos) from BC's very early days to today. 🔗 (Join L2 and support NSF here: ) Timestamps: 0:00 Sheet Piling Installed at Pad
Hide player controls
Hide resume playing