Stacking of Starbase's second tower began, the final two tower modules were moved to the Sanchez Lot from the Port of Brownsville, and Booster 12 underwent several tests on Pad A including a Spin Prime of its 33 Raptor engines. 🔗 NSF Store: ⚡ Become a member of NASASpaceflight's channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡ 🎥 Video from Jack (@theJackBeyer), Sean (@SeanKD_Photos), and Starbase Live. ✂️ Edited by Thomas (@_thomashayden). 🔍 If you are interested in using footage from this video, please review our content use policy: L2 Boca Chica (more clips and photos) from BC's very early days to today. 🔗 (Join L2 and support NSF here: ) Timestamps: 0:00 Chopsticks Lowered From B12 0:14 Ship 31 Moved Into Mega Bay 2 0:26 Crane Hooked to Tower Module One 0:48 Tower Sections Being Prepared 1:05 The Rocket Garden 1:19 The Production Site 1:27 Ship 30 in the High Bay 1:35 Ship 31 in Mega Bay 2 2:16 Dancefloor Removed From OLM 2:24 Tower Module 4 Moved From Port 2:39 First Tower Module Lifted 3:29 Work on the Office Building 3:38 Booster 12 Testing 3:56 Grid Fin Testing 4:04 Ship QD Arm Retract Test 4:12 Tower Module 2 Rolled Out 4:38 Ship QD Arm Retract Tests 5:25 The Orbital Tank Farm 5:44 Booster 12 Spin Prime 6:24 More Ship QD Arm Testing 6:35 Module 5 Arrives 7:28 CC 8800-1 Hooked to Module Two
Hide player controls
Hide resume playing