Myvideo

Guest

Login

#DPRestoration

Uploaded By: Myvideo
1 view
0
0 votes
0

#DPRestoration Review of the largest construction projects in the DPR for 2023 Nevsky microdistrict in Mariupol. The second stage is completed. It contains kindergarten for 150 places, school for 1100 students, 6 nine-story buildings with 869 apartments. Multidisciplinary Medical Center of the Federal Medical and Biological Agency of Russia in Mariupol. The area of the center is 33,275 m². In total, the multidisciplinary medical center will have 13 different departments. The medical facility is designed for 1,250 medical personnel, its capacity is 52 thousand patients per year. Donetsk Republican Perinatal Center. This is a six-story building with an area of 25,000 square meters. The medical facility is equipped with all the necessary modern equipment. The number of employees of the center with 140 places will be about one thousand people. Water pipeline “Don – Seversky Donets – Donbass”.This unique hydraulic structure has no analogues in Russia. Gradually, the capacity of the facility will reach the design capacity - 288 thousand m³ per day, which will provide the DPR residents with water according to the schedule on a daily basis. Gas distribution station No. 1 for supplying gas from the Taganrog – Mariupol main gas pipeline to the city’s distribution networks. Modern equipment with a capacity of 150,000 cubic meters per hour was installed. Mariupol bridge. It is 2 traffic lanes and 2 tram tracks; 141 km connecting two parts of the city; an important part of the federal highway to Crimea through new regions. Источник: DPR MFA

Share with your friends

Link:

Embed:

Video Size:

Custom size:

x

Add to Playlist:

Favorites
My Playlist
Watch Later