What started as a simple little job grew and became a completely new sewage tank. Conny went here to fix what he thought was a faulty seal, but it turned out that the tank was demolished and poorly anchored, all the pipes with the wrong lye and also a cracked pipe. We will divide this job into 2 parts. This time we focus on the tank and the cracked pipe. We do this because that part goes on the customer's insurance. In the spring, we will hopefully go back and fix the pipes that have the wrong slope, an infiltration bed and possibly a ditch at the plot boundary. Excavator: Cat 307c -Driver: C. Hansson (and a little of Hedblom) Dump Truck: Hydrema 910 -Driver: Irre Truck: Volvo FH 13 -Driver: Åberg On the Ground: Hedblom, Åberg & trainee David from Fredrika Bremergymnasiet. Water and sewer department for Nynäshamn (and Oracle): Julle Camera: GoPro Black 7 Video Editing: iMovie Location: Sweden Instagram: m_hedblom
Hide player controls
Hide resume playing