Myvideo

Guest

Login

Sydney Metro North West - Chatswood to Tallawong Full Ride

Uploaded By: Myvideo
13 views
0
0 votes
0

Sydney Metro officially opened on 26 May 2019. Trains will initially operate a train every 5 minutes in the peak with a train every 10 minutes on other times. Eventually, trains will run every 4 minutes and then operate at a maximum capacity of a train every two minutes in the peak, with a capacity of 45000 passengers. Recommended: Watch the video from Epping onwards since there is a random child squabbling along the ECRL making the video very noisy. However, there was a ten news reporter who's news report

Share with your friends

Link:

Embed:

Video Size:

Custom size:

x

Add to Playlist:

Favorites
My Playlist
Watch Later