Booster 7 and Ship 24 underwent Cryo testing on the Orbital Launch Mount, Ship 26s Nosecone was moved into the Mid Bay, and a new tent is going up near the Propellant Production Site. Video and Pictures from Nic (@nicansuini), Jack (@thejackbeyer), and the NSF Robots. Edited by Patrick (@Patrick_Colqu). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click “Join“ for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: Articles: NSF Store: L2 Boca Chica (more clips and photos) from BC's very early days to today. (Join L2 and support NSF here: ) 0:00 - Ship 26’s Nosecone in the High Bay 0:28 - Nosecone at the Production Site 0:56 - Booster 9 Forward Tank in the Mega Bay 1:36 - Work Near the Rocket Garden 2:04 - Nosecone Inside Tent 3 2:24 - View Into a Tent 2:41 - Starbase Sign 2:59 - Coil of Steel Moved 3:16 - Ship Barrel Section in Tent 1 3:32 - Nosecone in Tent 3 3:49 - Ship QD Arm Work Platform Moved Into Position 4:07 - Ship 26 Nosecone Moved Into the Mid Bay 4:47 - Barrel Section Moved in Tent 2 5:02 - The Rocket Garden 5:20 - Delivery to the Production Site 6:47 - Booster 6 Test Tank 7:06 - Warning Sign 7:23 - The Mega Bay 8:02 - New Tent Near the Propellant Production Site 8:54 - Full Stack Cryo Testing 10:23 - Ship 24 Depress Vent 10:41 - Booster 7 Depress Vent
Hide player controls
Hide resume playing