1.5 Kw North Wales Hydroelectric System Installation Part 1

Uploaded By: Myvideo
1 view
0
0 votes
0

For the last week me and Raf have been working on a customer hydro electric installation. the system will average around 1kw with peak output at full flow. We managed to get all the ground work down in one week. The next job on the list is a timber framed building and to start making the intake box and turbine.