The JR Yamanote Line is a 35km loop line that runs around central Tokyo carrying 3.5 million passengers per day. During the morning rush hour, 48 trains operate every 2 minutes, the punctual operation of which is overseen from an operation control center that makes use of the latest systems. At the Tokyo General Rolling Stock Center, a total of 550 vehicles are inspected and maintained. See how these 2 facilities support the accurate and safe operation of Tokyo’s busiest line. Then, join us at the construction site of Takanawa Gateway Station scheduled to open in 2020.
Hide player controls
Hide resume playing