Making time to work on the forge bellows. I see blacksmith work in my future. It’s been awhile and delay after delay I finally made time to get back to the things that matter to me. I did get the “wrought iron“ gate installed. I am still working on the Falcon rebuilt too. The 289 Short block is wrapped in a plastic trash bag to keep it clean while the heads went to the machine shop for a better valve job. It is the middle of summer here and the temp for the past several days has been well over 100 degrees.
Hide player controls
Hide resume playing