The New Bangkok Red SRT Train Line opened today on the 2nd of August 2021. There are 2 different lines, the Light Red Line to Taling Chan and the Dark Red Line that connects with Rangsit and Don Mueang Airport. รถไฟฟ้าสายสีแดง Took the Blue MRT to Bang Sue Grand Station and walked the underpass towards the Red SRT. This train will be free for the coming 3 months. Trains will run every 30 minutes. SRT stands for State Railway Thailand. The Dark Red line is 21,6 km long (13,42 miles) and the Light Red Line is 15 km long (9,32 miles) I took the train to the Bang Son station where it interchanges with the Purple MRT line.
Hide player controls
Hide resume playing