As the orbital site rebuild continues, gas cylinders potentially for the deluge were seen at the launch site. These cylinders may power the deluge system during launch. Also more damaged pieces were removed from the launch mount. 🔗 NSF Store: ⚡ Become a member of NASASpaceflight's channel for exclusive discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡ 🎥 Video from Nic (@NicAnsuini), Chris (chrisk_91), and Starbase Live. ✂️ Edited by Thomas (@_thomashayden). 🔍 All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. L2 Boca Chica (more clips and photos) from BC's very early days to today. 🔗 (Join L2 and support NSF here: ) #Starship #booster9 #starbase #bocachica #spacex Timestamps: 0:00 Ship 26 0:16 The Rocket Garden 0:30 Work on New Buildings 1:23 The Mega Bay 1:53 Mega Bay Extension 2:22 Nominal Segment Delivery 3:07 Water Pumped From Trench 3:23 Rebar Lowered Into Hole 4:05 Concrete Poured Into Hole 4:45 Work Continues Into the Night 5:09 Cryo Pipes Removed 5:30 Set of Rebar Installed 5:45 Concrete Poured 6:14 Foundation Work Around the OLM 7:34 Booster Quick Disconnect 8:11 The Orbital Launch Tower 8:50 Conduit Laid in Trench 9:41 Tracking Dish Moved 9:56 Ship 29’s Nosecone Lifted 10:10 Drilling Rig Hard at Work 10:22 Rebar Lowered Into the New Hole 10:32 Tremie Pipe Lowered 10:53 And Concrete Poured Into the Hole 11:04 Conduit Pulled Further 11:28 The Orbital Launch Mount 11:50 High Pressure Gas Cylinders 12:04 Removed Cryo Pipes 12:21 Orbital Launch Tower 12:38 Scaffolding on the OLM 12:50 The Ship Quick Disconnect 13:02 The Orbital Tank Farm 13:42 Booster Quick Disconnect 13:53 Methane Recondensers 14:02 The Chopsticks 14:13 Launch Tower Shielding 14:23 Nosecone and Barrel Sections 14:33 Methane Sump Delivered 15:13 Dirt Brought to Pit
Hide player controls
Hide resume playing