A Ship aft section with a new design was flipped, Ship 20 was prepared for cryogenic proof testing, and a new dome design was spotted. Video and Pictures from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Patrick (@Patrick_Colqu). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click “Join“ for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: Articles: NSF Store: L2 Boca Chica (more clips and photos) from BC's very early days to today. (Join L2 and support NSF here: ) 0:00 - Ship Quick Disconnect Arm Connected to Ship 20 0:30 - Sunrise at the Launch Site 0:54 - The Production Site 1:09 - Crane Moved Into Tent 1 1:35 - Ship Aft Do
Hide player controls
Hide resume playing