The Orbital Launch Site was prepped for Booster 7 to return and continue static fire testing, Ship 25's nosecone was disconnected from the crane in the High Bay, and Starfactory progress continues. Video and pictures from Mary (@BocaChicaGal) and Nic (@NicAnsuini). Edited by Patrick Colquhoun(@Patrick_Colqu). All content copyright to NSF. Not to be used elsewhere without explicit permission from NSF. Click “Join“ for access to early fast turnaround clips, exclusive discord access with the NSF team, etc - to support the channel. Rolling Updates and Discussion: Articles: NSF Store: L2 Boca Chica (more clips and photos) from BC's very early days to today. (Join L2 and support NSF here: ) 0:00 - sunrise 0:18 - Work on the Orbital Launch Pad 1:59 - The Chopsticks 2:54 - Construction Work at the Launch Site 3:15 - Raptor Bell 3:47 - The Production Site 4:00 - Ship 25 Nosecone and Aft Tank Section in the High Bay 5:10 - Booster 7 in the Mega Bay 5:39 - Starfactory 6:28 - Nosecone Lifting Jig 7:03 - The Propellant Production Site and Rocket Garden 7:19 - The Rocket Garden 7:37 - The Mega, High, and Mid Bays 7:55 - Barrel Sections in Front of Tent 1 8:12 - Gaseous Nitrogen Trailer Moved
Hide player controls
Hide resume playing